The Biofilter works in conjunction with a Primary Settlement Tank. From here partially treated effluent enters the battle zone, where an irregation
pump is used to spray the liquid over the media via the distribution system. This process is repeated until eventually the
effluent is allowed to settle in the final settlement zonefrom where it is discharged at a standard to satisfy the Enviroment Agency. A Secondary sludge return pump periodically removes dead bacteria by returning it to the primary settlement tank, where it is stored until removed by tanker.
Maxi Range garden view
Ten Good Reasons :- Designed to BS 6297 - Design and Installation of small septic tanks sewage treatment works. Very competitively priced. Probably the most realistically priced on the market.. Constructed of high quality Glass Fibre. Superior Grundfos pumps and efficient random media. Single phase. Simple installation - the unit has a holding down plate at the base. Commissioning service. Sample Chamber, Grease Trap and Pump Station, optional extras if required. 3 year warranty on working parts. Electrical cable and pressure pipe also available.