K-Drainage (Kent) are not just local...Call us or email us with any enquiries.
How long will the job take?
The job will take approximately 2 to 3 days for a sewage treatment plant to be installed.This is however dependant on the ground conditions and which type of system is required. ie, consept,pumping treatment plants,septic tanks
What will happen to all the soil that is left over?
I can arrange for it to be taken away for you or I can give you a contact number for it to be taken away.
Can the concept be discharged into ditches and water courses?
Yes this is in line with environment agency ruling.All of our processes are strictly adhered to the environment agency rulings
Electrical work for treatment plants, consept, pumping
stations and all other electrical products?
The electrical work can be carried out by myself or a qualified electrician. I can arrange a view.
What will happen to the existing septic tank once the sewage treatment
plant is installed?
The sewage treatment plant will have to be emptied. I will then lime the
tank, and then break it in and backfill with with the existing soil that is left
over.
If you have any questions about anything not cover in this website please call & we will be pleased to help. Land line : 01732 368265
or
Mobile : 077861 75816
If you prefer send us an email we will be happy to supply you with any information you require about septic tank emptying, any drainage problems or cesspit,cesspool sewage treatment plant installations. We also have a downloadable guide here:-Wastewater & Drainage Tips & Pointers Guide If you would like to
save a copy of this to your own computer,when it is open - goto the top left of your browser and click on save page as.
To view a copy once downloaded to your own desktop an Adobe Reader is required to open the above guide. If you do not have one click on the image below to download an Adobe Reader....